JTB Geopolymer Grout, also referred to as geopolymer injection grout, is a high-strength polymer-based material offering high toughness, low permeability, good durability, and reliable flowability. It is ideally suited for applications such as underground cavity filling, foundation collapse repair, void remediation, and structural injection grouting. In addition, it serves as a fast, trenchless, micro-invasive injection solution for highway grade and pavement base reinforcement.
• Reliable flowability & high Strength
• Reliable durability
• Full early strength, slight expansion
• High filling capacity
• Strong concrete bond
• Void filling and grouting for underground cavities and tunnels
• Repair of road subsidence and foundation collapse
• Subgrade void grouting and stabilization
• Ground improvement and foundation reinforcement
• Surface preparation: Before construction, thoroughly clean the loose dust, grease and loose substances on the base surface to ensure that the base surface is clean, tidy, solid and flat. Check whether the grouting equipment is intact and undamaged. After ensuring that there are no errors, proceed to the next step.
• Drilling: According to the design requirements, use a drilling rig to drill holes at the locations where grouting is needed. The depth and diameter of the drilled holes must comply with the design requirements.
• Grouting pipe setting: Insert the grouting pipe into the drilled hole, ensuring that the grouting pipe reaches the bottom of the hole, and fill an appropriate amount of dry-hard cement mortar around the grouting pipe.
• Grouting: Mix the JTB Geopolymer Grout evenly according to a water-to-material ratio of 28%-30%. Then, use the grouting pump to inject the grouting material into the grouting pipe until it is completely filled.
• Curing: After the grouting is completed, the grouting part should be cured. In general, the curing time should not be less than seven days.
Packaging specification: Packed in bags, 40 kg per bag.
Storage: Store in a sealed container in a cool and dry place.
Shelf life: Not exceeding 6 months.
This product is non-toxic and non-flammable, and can be transported as non-hazardous goods.
Shelf life is 6 months from the date of production.
Beyond the shelf life, the product may still be used after re-inspection confirms compliance.
| Compressive strength of 28 days | MPa | 3d | 7d | 28d | 1d | 3d | 28d |
| ≥20.0 | ≥40.0 | ≥50.0 | 34 | 51 | 60 | ||
| 1d | 3d | 28d | 1d | 3d | 28d | ||
| 28-day flexural strength | MPa | ≥5 | ≥6 | ≥10 | 5.5 | 7.3 | 10.5 |
| Gas content | % | 1-3 | 1.3 | ||||
| 24 Free bleeding rate | % | 0 | 0 | ||||
| Pressure bleeding rate | % | ≤2.0 | 1 | ||||
| Cl ion content | % | ≤0.06 | 0.015 | ||||
JTB technology group are committed to providing customers in all sectors with valuable products and
solutions that offer convenience and efficiency.
Setting a 40-tonne compressor on its foundation looks simple until you measure the gap: typically 25 to 80 millimetres between the underside of the steel baseplate and the top of the concrete. That gap carries the entire operating load, plus vibration, thermal movement and occas...
READ MOREA base plate sits 25 mm above a concrete foundation, and every tonne that presses, vibrates, or torques the equipment above it will pass through that gap. Fill it with ordinary mortar and the mix dries, shrinks, and pulls away from the steel. Leave it as-cast concrete and the co...
READ MOREA concrete patch usually fails where the new material meets the old one. Unmodified cement-sand mortars shrink as they dry, bond weakly to the prepared substrate, and open a hairline gap that admits water and chlorides — the very corrosion cycle you were trying to stop. Polymer-...
READ MORE