JTB-207 Rapid Repair Mortar for Concrete Pavement is a specially formulated repair material designed for the rapid restoration of distressed concrete pavements, including pitting, delamination, surface scaling, spalling, cracking, and exposed reinforcement. It enables a short construction window, allowing traffic reopening within two hours after application.
• High bonding strength
• High durability & aging resistance
• High compressive strength
• High flowability, waterproof & corrosion resistant
• Eco-friendly, suitable for repairs
• Timely repair of rough, hollow, scaling, spalling, cracking, and exposed-rebar concrete pavements
• Surface preparation: Remove the loose parts of bulging, peeling, cracking and other areas. For areas with less than 3mm, overly flat areas and areas with oil stains, roughen them up. Thoroughly moisten the base surface with clean water, but there should be no standing water, or directly apply the JTB Interface Bonding Agent evenly.
• Mixing and stirring: Mix the material with water and stir it. Follow the 28% water-to-material ratio. Add water while stirring material. During the stirring process, ensure thorough and uniform mixing. The recommended duration is about 3 minutes.
• Construction: According to the working surface and construction progress, the materials mixed each time should be completed within 20 minutes.
• Maintenance: After the initial setting of the construction surface, water (spray) maintenance is required. For horizontal ground, it should also be covered with damp gunny bags, etc. Maintenance should be carried out in an environment of 5-40℃.
The factory‑supplied pallet stretch film and bottom wooden pallets effectively protect products against water, dust and moisture, as well as safeguard outer packaging. Please do not damage them before opening and use.
(Stretch film and wooden pallets are not provided for small‑quantity orders.)
Packaging specification: Available in 25 kg bags.
Storage: Store in a cool, dry, and well-ventilated warehouse. Do not expose to direct sunlight or rain. In winter, take precautions to prevent freezing.
Shelf life: 6 months under normal transportation and storage conditions. Beyond the shelf life, the product should be re-inspected and found qualified before use.
This product contains cement and may cause irritation to the eyes and skin. Please wear appropriate protective equipment during application.
In case of accidental eye contact, rinse immediately with clean water and seek medical attention promptly.
JTB technology group are committed to providing customers in all sectors with valuable products and
solutions that offer convenience and efficiency.
Setting a 40-tonne compressor on its foundation looks simple until you measure the gap: typically 25 to 80 millimetres between the underside of the steel baseplate and the top of the concrete. That gap carries the entire operating load, plus vibration, thermal movement and occas...
READ MOREA base plate sits 25 mm above a concrete foundation, and every tonne that presses, vibrates, or torques the equipment above it will pass through that gap. Fill it with ordinary mortar and the mix dries, shrinks, and pulls away from the steel. Leave it as-cast concrete and the co...
READ MOREA concrete patch usually fails where the new material meets the old one. Unmodified cement-sand mortars shrink as they dry, bond weakly to the prepared substrate, and open a hairline gap that admits water and chlorides — the very corrosion cycle you were trying to stop. Polymer-...
READ MORE