JTB Rebar Coupler Grout is a cement-based, pre-blended dry mix composed of cement, fine aggregates, and specialized concrete admixtures. On site, it requires only the addition of water to produce a self-leveling slurry with reliable flowability.
• High flowability
• Plastic expansion
• Post-setting expansion
• Early & high strength
• Easy application
• Prefabricated residential & industrial housing: connection of columns, shear walls to foundations
• Secondary grouting for large equipment foundations
• Secondary grouting for high-rise steel structure column bases
• Other applications requiring high strength & good flowability
• Surface preparation: Clean the construction surface and remove loose dust, oil stains, etc. from the base surface. Manual or mechanical roughening (or application of interface agent) shall be carried out. All construction surfaces must be solid and free of standing water.
• Grouting preparation: Check whether the grouting holes and exhaust holes are blocked. If they are blocked, they need to be cleared first; connect the grouting pipe and prepare the plug.
• Mixing: Weigh the Rebar Coupler Grout. The weight of water should be 12% of the material. Stir thoroughly for 3 minutes. It is recommended to use mechanical mixing.
• Grouting: Manual or mechanical grouting is adopted. Grouting starts from one end and flows out from the other end, then the grouting port and the air outlet are closed.
• Note: The grouting area must not be disturbed within 24 hours after grouting. Within 3 days after grouting and pressing, the temperature of the beam body and the environment must not be lower than 5℃, and the temperature of the slurry should be between 5℃ and 30℃. Otherwise, measures should be taken to meet the requirements.
Packaging specification: Packed in lined plastic film kraft paper bags, net weight 25 kg per bag or 50 kg per bag.
Storage: Store in a dry and well-ventilated indoor area.
Shelf life: 6 months under the above conditions. If it exceeds the storage period, it should be inspected and found qualified before use.
The product contains chemical ingredients that can irritate the eyes and skin. Please wear the necessary protective gear during construction. In case of accidental eye contact, flush immediately with plenty of clean water and seek medical attention promptly.
| Project | Standard indicators | Detection value | |
| Setting time | Initial condensation | ≥5 | 6 |
| Final condensation | ≤24 | 16 | |
| Fluidity | Initial fluidity | 10-17 | 15 |
| 30min flow rate | 10-20 | 18 | |
| 60min flow rate | 10-25 | 22 | |
| Bleeding rate | 24h free bleeding rate | 0 | 0 |
| 3h bleeding rate between steel wires | 0 | 0 | |
| Compressive strength | 3d | ≥20 | 25 |
| 7d | ≥40 | 48 | |
| 28d | ≥60 | 63 | |
| Flexural strength | 3d | ≥5 | 6 |
| 7d | ≥6 | 7.5 | |
| 28d | ≥10 | 11 | |
| Pressure bleeding rate | When the vertical height of the channel is ≤1.8 meters (0.22MPa) | ≤2.0 | 1.3 |
| When the vertical height of the channel is greater than 1.8 meters (0.36MPa) | ≤2.0 | 1.3 | |
| Free expansion rate | 3h | 0-2 | 0.16 |
| 24h | 0-3 | 0.25 | |
| The corrosive effect on steel bars | No rust | No rust | |
JTB technology group are committed to providing customers in all sectors with valuable products and
solutions that offer convenience and efficiency.
Setting a 40-tonne compressor on its foundation looks simple until you measure the gap: typically 25 to 80 millimetres between the underside of the steel baseplate and the top of the concrete. That gap carries the entire operating load, plus vibration, thermal movement and occas...
READ MOREA base plate sits 25 mm above a concrete foundation, and every tonne that presses, vibrates, or torques the equipment above it will pass through that gap. Fill it with ordinary mortar and the mix dries, shrinks, and pulls away from the steel. Leave it as-cast concrete and the co...
READ MOREA concrete patch usually fails where the new material meets the old one. Unmodified cement-sand mortars shrink as they dry, bond weakly to the prepared substrate, and open a hairline gap that admits water and chlorides — the very corrosion cycle you were trying to stop. Polymer-...
READ MORE